This Jabba speaker brings good times wherever it goes. It provides two hours of continuous playback through Bluetooth and features a standard 3.5mm audio input for connecting with other devices. The 33-foot range is perfect for road trips, beach days, and parties.
.: 100% ABS plastic exterior .: 10-meter (33 feet) Bluetooth working range .: Two hours of playback time .: Built in Li-ion battery, 3.7V/500mAh .: Plays audio from devices using Bluetooth or Aux cable (3.5mm port)
Jabba Bluetooth Speaker
SKU: 15889249953658048046
$44.00Price

